Mulvane Water Treatment Plant
Project Owner City of Mulvane Project Delivery Method Design-Build Completion Date / Total Time for Project August 2014 / 11 months Project Value $5.3 Million

Project Overview

UCI and design partner PEC provided a proposal to the City of Mulvane for the design and construction of a new water treatment plant based on preliminary design and selected process equipment.  The preselected equipment was Greensand Filters by Hungerford & Terry and Reverse Osmosis units by G.E.  The design and permitting began in September 2013 and construction began in January 2014.

Major components of the project included:

  • Design and permitting by KDHE
  • Earthwork, paving, fencing
  • Wastewater pump station
  • Raw and finished water lines
  • Well Houses rehabilitations
  • Raw & finished water clear wells
  • Building & equipment foundations
  • Pre-engineered metal building
  • Interior build out-offices, lab, electrical,
  • Storage and chemical feed Rooms
  • Process Equipment Installation
    • Greensand filters
    • Reverse osmosis equipment
    • Raw and finished water pumps
    • 5 chemical feed systems
  • Process piping and valves
  • Process instrumentation and controls
  • Mechanical-HVAC and plumbing
  • Electrical power and controls
    • Stand-by generator
  • Commissioning, testing & start-up

The project team was able to design and construct this facility in 11 months’ time, giving the City of Mulvane a secure source of water and ability to expand for the future.